END2END can support and maintain all of the components that constitute a Data Centre / Computer Room. The following are the typical components:

Data Centre / Computer Room Components
ComponentCover/Response AvailableService Deliverables (for all levels of Cover)
A/CFully Comprehensive - 24 x 7, 365 days a year with a 4 hour response (all parts and labour) + PM's
Time and Materials- 24 x 7 or 9-5 Monday to Friday excluding Bank Holidays. Includes PM's but excludes parts and labour
Waranty Uplift- 24 x 7 4 hour response + PM's (only year 1)
Break/Fix - Includes problem isolation, on-site visits as required to resolve the problem and all parts and labour
Preventative Servicing- 2 or 4 service inspections per annum (dependent on type of component) undertaken during normal working hours to complete standard servicing (e.g. filter replacement)
Reporting-A report is issued to designated personnel, which gives the status of the components
Monitoring
Fire Sys.
Generators
Security Sys.
UPS's

IT Style ComponentsCover/Response Available
KVM/ Env. Monitoring Systems Hot Standby - Loan system held on customer site available for instant swap
Return to Base - Replacement item delivered within 72 hours

Contact Us or Call one of our Consultants on 0118 903 6648


Maintenance Services
Remote Monitoring
Computer Room Audits
 
DATA CENTRE NEWS
END2END launch new cost-effective rack current meter 
END2END provide Remote Monitoring Service for North Lincs Council 
END2END win deal to extend ITEX Data Centre facilities 
R22 A/C Phase out -if your system runs on it - call us ! 
END2END completes build for Allport
END2END completes 2 Computer Room Projects at North Lincs Council
Monitoring the Power in your Data Centre - The first step towards measuring your PUE
Is yourData Centre based on 'Best Practices'? - Check here!
Company Overview
Best Practices Summary
Recruitment Vacancies 
Useful Links 
The Data Centre Life Cycle
Methodology
Technology Room Overview
Data Centres/Computer Rooms
Call Centres
Operations Centres
Audio Visual Suites
Design and Build
Requirements Workshops
Environmental Surveys
Site Selection Surveys 
Support and Maintenance Services
Tender Preparation 
Energy Efficiency Services 
CFD (Thermal Modelling) Services 
Data Centre Construction
Data Centre Cooling
Data Cabling Installation 
Data Centre Power Monitoring 
Data Centre Power 
Managing Energy -Power Factor Correction 
Environmental Monitoring Systems
UPS's
Generators
KVM Switches (Remote IT Management)
Electrical Distribution Board Meters 
Water Leak Detection Systems
Rack PDU's 
Rack Meters 
IT Racks and Cabinets
Fire Systems 
Security Systems
Case Studies Overview
Thames Valley Police 
Allport 
North Lincolnshire Council 
Business Services Centre (NHS)
EAGA Partnership
Homegroup Ltd
ITEX Group 
Nielsen Media 
UTC (Kidde)
Purple Parking
SG Hambros 
Walsall Housing Group1
Walsall Housing Group2
Learning Zone Overview
Data Centre Life Cycle
Data Centre Components
Library and Downloads 
Other Technology Rooms 
learning zone overview
room information
component technical
library