Data Centre Capacity Planning FAQs
The following table contains the most frequently asked questions with some possible answers/solutions

Question Answer
What is Capacity Planning?Capacity Planning defines the power and cooling loads for your Computer Room. It is essential to understand the maximum amount that IT requires, so that plant (e.g. AC units, UPSs and generators) can be sized accordingly when the room is first designed. Once the room is running it enables you to keep an an eye on the used capacity so that you can plan for any required growth
How do I undertake a Capacity Planning Exercise?Companies such as END2END can perform this exercise or if you want to do a rough estimate yourself:
For a new room
- Calculate the loads for power and heat for your IT estate. These will normally be listed in the technical specification for the device, however, these figures are often inflated (by 50% in some cases). This figure can then be used to size your UPS and Air Conditioning Requirements
- Calculate the load for power of the selected AC units
- Add the results together to get max power load required for the room

For an Existing Room
- Analyse your UPS readings to determine the operating loads for the current IT equipment
- Subtract these from the maximum supported by the UPS

- You now have the maximum growth that the room can sustain


Company Overview
Best Practices Summary
Recruitment Vacancies 
Useful Links 
The Data Centre Life Cycle
Methodology
Technology Room Overview
Data Centres/Computer Rooms
Call Centres
Operations Centres
Audio Visual Suites
Design and Build
Requirements Workshops
Environmental Surveys
Site Selection Surveys 
Support and Maintenance Services
Tender Preparation 
Energy Efficiency Services 
CFD (Thermal Modelling) Services 
Data Centre Construction
Data Centre Cooling
Data Cabling Installation 
Data Centre Power Monitoring 
Data Centre Power 
Managing Energy -Power Factor Correction 
Environmental Monitoring Systems
UPS's
Generators
KVM Switches (Remote IT Management)
Electrical Distribution Board Meters 
Water Leak Detection Systems
Rack PDU's 
Rack Meters 
IT Racks and Cabinets
Fire Systems 
Security Systems
Case Studies Overview
Thames Valley Police 
Allport 
North Lincolnshire Council 
Business Services Centre (NHS)
EAGA Partnership
Homegroup Ltd
ITEX Group 
Nielsen Media 
UTC (Kidde)
Purple Parking
SG Hambros 
Walsall Housing Group1
Walsall Housing Group2
Learning Zone Overview
Data Centre Life Cycle
Data Centre Components
Library and Downloads 
Other Technology Rooms 
learning zone overview
room information
component technical
library
Product Solutions Overview
Air Conditioning (Computer Rooms)
Air Conditioning (Call Centres) 
Data Cabling
Display Systems 
Electrical Distribution Systems
Environmental Monitoring
Fire Detection/Suppression
Furniture
Generators
Racks for IT Equipment
KVM Switches
Raised Access Floors (Computer Rooms)
Remote IT Management
Security Systems
UPS's
Walls/Ceilings/Doors/ Windows 
Accounts Overview 
Document Templates
Instructions
Business Development Overview 
Document Templates
Instructions
Consultancy Overview
Design
Environmental Survey
Feasibility Study 
Workshop 
HR Overview 
Document Templates
Instructions