Modern IT equipment generates a large amount of heat and the problem increases with higher density IT kit (e.g. Blade Servers). It is, therefore, essential to use the correct type of cooling and to understand the air flow requirements within the room. Failure to achive this can have disastrous results with 'deadly' hot-spots happening just where you don't need them - around your key mission critical servers.
Choosing the Right Cooling

Data Centre cooling solutions must be able to respond to the environment and adapt the climate to keep it constant. IT doesn't like large variations in climate. END2END are not tied to any single manufacturer, so we choose exactly the right cooling mix: See Learning Zone for more detail on the different types!
Downflow Air Conditioning - most widely adopted for professional Data Centres
Cold Aisle Containment or Hot Aisle Containment - Used to improve efficiency
Chilled Racks - can be utilised in conjunction with chillers for real high density requirements (10-30kW per rack)
DX (refrigerant) or Chillers - can be utilised as the cooling medium
Do you have a Data Centre Cooling Issue?

If so, contact us - we have skilled specialists and can utilise state of the art
thermal modelling tools (CFD) to understand and correct any problems.
Contact Us or Call one of our Consultants on 0118 903 6648


Data Centre Construction
Data Centre Cooling
Data Cabling 
Data Centre Power 
Managing Energy Use 
Enviromental Monitoring Systems
Uninterruptible Power Supplies
Power Monitoring Equipment 
Generators 
KVM (Remote IT Management) 
IT Racks and Cabinets
Rack PDUs 
Water Leak Detection Systems 
Fire Systems
Security Systems
 
DATA CENTRE NEWS
END2END launch new cost-effective rack current meter 
END2END provide Remote Monitoring Service for North Lincs Council 
END2END win deal to extend ITEX Data Centre facilities 
R22 A/C Phase out -if your system runs on it - call us ! 
END2END completes build for Allport
END2END completes 2 Computer Room Projects at North Lincs Council
Monitoring the Power in your Data Centre - The first step towards measuring your PUE
Is yourData Centre based on 'Best Practices'? - Check here!
Company Overview
Best Practices Summary
Recruitment Vacancies 
Useful Links 
The Data Centre Life Cycle
Methodology
Technology Room Overview
Data Centres/Computer Rooms
Call Centres
Operations Centres
Audio Visual Suites
Design and Build
Requirements Workshops
Environmental Surveys
Site Selection Surveys 
Support and Maintenance Services
Tender Preparation 
Energy Efficiency Services 
CFD (Thermal Modelling) Services 
Data Centre Construction
Data Centre Cooling
Data Cabling Installation 
Data Centre Power Monitoring 
Data Centre Power 
Managing Energy -Power Factor Correction 
Environmental Monitoring Systems
UPS's
Generators
KVM Switches (Remote IT Management)
Electrical Distribution Board Meters 
Water Leak Detection Systems
Rack PDU's 
Rack Meters 
IT Racks and Cabinets
Fire Systems 
Security Systems
Case Studies Overview
Thames Valley Police 
Allport 
North Lincolnshire Council 
Business Services Centre (NHS)
EAGA Partnership
Homegroup Ltd
ITEX Group 
Nielsen Media 
UTC (Kidde)
Purple Parking
SG Hambros 
Walsall Housing Group1
Walsall Housing Group2
Learning Zone Overview
Data Centre Life Cycle
Data Centre Components
Library and Downloads 
Other Technology Rooms 
learning zone overview
room information
component technical
library