© END2END Services Ltd
Terms & Conditions
Privacy Policy
 
i-ntarsia managed site
Environmental Surveys
Every Computer Room is a complex web of interacting systems and infrastructures. That's why the deterioration of any single component can have a significant affect on the IT environment as a whole. Recognise the issues early and proactive measures can be taken to ward off any lasting or damaging impact.
Problems can be wide and varied; electrical and earthing problems; air conditioning inadequacies; dust contamination and many more. None need be serious, if detected and dealt with promptly.

What happens during the Survey?
END2END’s environmental survey examines the environmental fabric of your Computer Room and assesses its suitability to accommodate the systems it houses. The survey includes an inspection of the electrical systems, air conditioning, physical security and cabling infrastructure to ensure they are operating correctly and are 'fit for purpose'. It assesses all and every risk to the environment from the threat of water leak to the operational and health and safety aspects of the room. In fact, it reviews all of the areas where a problem could impact your day to day business operation.
The Result of a Survey
The Survey provides a comprehensive report on any issues and any recommendations. The Report is delivered to you and then subsequently the findings are presented to you by an END2END Technology Room Consultant, so that you can digest the information first and then discuss fully the issues and the suggested recommendations proposed.
Contact Us or Call one of our Consultants on 0118 903 6648


Requirements Workshops 
Environmental Surveys 
Site Selection Surveys 
Power Surveys 
Structural Surveys 
Tender Preparation/Evaluation 
Installation Planning
CFD (Thermal Modelling) 
 
DATA CENTRE NEWS
END2END Job vacancies 
Civil Nuclear Constabulary choose END2END 
END2END launch new cost-effective rack current meter 
END2END provide Remote Monitoring Service for North Lincs Council 
END2END complete extension of ITEX Data Centre facilities 
R22 A/C Phase out -if your system runs on it - call us ! 
END2END completes build for Allport
END2END completes 2 Computer Room Projects at North Lincs Council
Monitoring the Power in your Data Centre - The first step towards measuring your PUE
Is yourData Centre based on 'Best Practices'? - Check here!
Company Overview
Best Practices Summary
Recruitment Vacancies 
Useful Links 
The Data Centre Life Cycle
Methodology
Technology Room Overview
Data Centres/Computer Rooms
Call Centres
Operations Centres
Audio Visual Suites
Design and Build
Requirements Workshops
Environmental Surveys
Site Selection Surveys 
Support and Maintenance Services
Tender Preparation 
Energy Efficiency Services 
CFD (Thermal Modelling) Services 
Data Centre Construction
Data Centre Cooling
Data Cabling Installation 
Data Centre Power Monitoring 
Data Centre Power 
Managing Energy -Power Factor Correction 
Environmental Monitoring Systems
UPS's
Generators
KVM Switches (Remote IT Management)
Electrical Distribution Board Meters 
Water Leak Detection Systems
Rack PDU's 
Rack Meters 
IT Racks and Cabinets
Fire Systems 
Security Systems
Case Studies Overview
Thames Valley Police 
Civil Nuclear Constabulary
Allport 
North Lincolnshire Council 
Business Services Centre (NHS)
EAGA Partnership
Homegroup Ltd
ITEX Group 
ITEX Offshore 
Nielsen Media 
UTC (Kidde)
Purple Parking
SG Hambros 
Walsall Housing Group1
Walsall Housing Group2
Learning Zone Overview
Data Centre Life Cycle
Data Centre Components
Library and Downloads 
Other Technology Rooms 
learning zone overview
room information
component technical
library