The
Assessment firstly reviews your Data Centre to look at all of the
potential areas of power wastage:
- Poor Data Centre Layout
- Poor Intra-rack layout of IT equipment - Cooling System Inefficiencies
- etc.
Next, the review looks at a set of recommendations to
correct the areas of concern. We look at this from 2 points of view.
The first is to look at cheap inexpensive wins and there are
configuration activities that can make a huge difference. The second
is to look infrastructure changes that could be made with the
potential ROI defined.
Following that, the review suggests
other types of assessment that could help to provide more detail and
even greater savings .i.e. Thermal Modelling of the facility, which can highlight
huge savings impossible to calculate any other way.
Finally, we review how your Data Centre can be continually monitored so that you
can keep an eye on its load and the effectiveness of changes.
| |
|